The Year Nobody Could See

The Year Nobody Could See

A consultant cuts a number by 30%, presents the slides, and leaves. Three months later, the number is back where it started. I have watched that version many times, and I have been the consultant in it. I have also been the one whose fix was still running long after I was gone. The difference showed up in how the fix got built. The diagnosis: leadership was reading status, not time The team ran the path to production at a large enterprise. As usual, the process involved other specialized teams such as security, infrastructure, and cloud. One application took more than a year to get through it. Nobody inside the pipeline knew that, and everybody was doing their job. ...

+45% satisfaction from 30 phone calls

+45% satisfaction from 30 phone calls

One question has trailed the AI wave into every product conversation this year: why bother with customer discovery when you can build the thing in a weekend? The answer got clearer, and it points somewhere most teams are not looking. AI multiplied every team’s capacity to act. We get more code shipped, and more tickets closed. It added nothing to our capacity to know where to act. Over half of new features still fail to deliver the value teams expected. Mostly because they aim at the wrong problem, faster. ...

Release Failures Hit Zero. Then They Bounced Back

Release Failures Hit Zero. Then They Bounced Back

The number had just hit zero. For the first time in months, the number of release failures reaching production was zero. Three months of digging had gotten the team there. I could have written up the win that same afternoon and gone home. One month later, it was back up. I have watched this shape play out on enough teams to trust it. A team fixes the real thing, the number falls, everyone breathes out, and then it drifts back. Here is the story of one team that lived exactly that, and the part that finally held. ...

Management Obeya: How an IT Services Team Built Their Own War Room

Management Obeya: How an IT Services Team Built Their Own War Room

KEY TAKEAWAYS A management Obeya is the leadership team’s operating system made visible. It tracks the health of the business, not project deliveries. Seven boards on the walls of one room replaced opinion-based meetings with weekly data-driven sessions in 60 minutes. The agency director continued to run the Obeya after the engagement ended. The boards evolved, the weekly rhythm never stopped. An IT services agency director wanted to change how his management team worked together. He had a strategy and objectives. He also had talented people running operations, commercial development, and client delivery. What he did not have was a way to see it all in one place, discuss it factually, and solve problems before they became crises. ...

From 24% to 55% On-Time Delivery: A Project Obeya Room Case Study

From 24% to 55% On-Time Delivery: A Project Obeya Room Case Study

KEY TAKEAWAYS A BI team managing nearly 20 projects across several continents built an Obeya room and doubled on-time delivery in 3 months. The Obeya surfaced milestone collisions, quality failures, and ownership gaps that no status report had ever shown. Three PDCAs run inside the Obeya rescued a go-live, halved defects per delivery, and created a standard that the team still uses. Get the Full Project Obeya Template with all the boards layout: Strategy, performance, macro planning, and problem-solving. Ready to print and fill in. [Download Free Template →] ...

How We Halved DevOps Deployment Lead Time

How We Halved DevOps Deployment Lead Time

KEY TAKEAWAYS A DevOps team cut its infrastructure deployment lead time by more than half. The team followed Agile practices well. The blockers hid in cross-team handoffs where no ceremony could reach. Value stream mapping revealed about half the lead time lost in a single queue due to unclear routing and missing documentation. Simple interventions drove the result: checklists, front-loaded requests, early handovers. No new tools. No reorganization. The Problem A DevOps team at a large enterprise handled cloud infrastructure deployments. A small DevOps team, working across multiple projects, supported development teams who needed environments to build and test their applications. ...

How a 15-Person COBOL Team Cut Defects 91% in 60 Days

How a 15-Person COBOL Team Cut Defects 91% in 60 Days

A financial software case study. How visual management, daily flash meetings, and team-led PDCAs replaced rework with ownership. KEY TAKEAWAYS A 15-person COBOL team at a financial institution reduced defects from 93 per month to 8 in two months. The team ran their own PDCAs using visual management and daily flash meetings. The method works the same for different tech teams: software development, testing, tech support, IT operations, and project delivery. Results from real coached teams: 91% defect reduction in financial software, 160% testing productivity gain, 94% backlog cleared in e-services support, 70% on-time resolution improvement in energy sector IT operations. Does Your Team Have the Same Problem? Take the 3-minute Delivery Scorecard to find out: Where your delivery system breaks down Whether you’re fixing symptoms or root causes Your biggest improvement opportunity right now Find Your Team’s #1 Bottleneck (Free) → ...

Lean Testing Case Study: 24% Productivity Gain in Three Months

Lean Testing Case Study: 24% Productivity Gain in Three Months

KEY TAKEAWAYS A 13-person billing test team increased productivity by 24% in three months by making work visible, setting daily targets, and solving problems one at a time with PDCA. Diagnostic before action: observing testers at their workstations revealed hidden waste like seven help requests in three hours, repeated tests without conclusions, and two-hour solo investigations. When the project manager changed mid-project, the new manager walked into a team that ran itself. Visual boards, tracked indicators, and clear action plans made the transition seamless. Get the Lean Testing Quick-Start Kit. 4 practices, real results, a two-week plan to start Monday. Get the Kit → ...

Lean Testing at Sopra Steria: How We Tripled Testing Productivity in 3 Months

Lean Testing at Sopra Steria: How We Tripled Testing Productivity in 3 Months

KEY TAKEAWAYS False defects dropped from 44% to 4% by implementing an andon system where testers call for help before reporting uncertain bugs Testing productivity more than tripled (from 1.5 to 8 tests per person per day) through a pull flow system with daily targets Failed corrections dropped from 23% to 10% using a quality wall with expert verification Client satisfaction recovered after years of complaints, with the client noting clear improvement in service quality This case study was co-presented with Arnaud Cailleau, then Director of Testing Services at Sopra Steria. [Download the original presentation (PDF)] ...

How to Scale Customer Support Without Just Hiring More People

How to Scale Customer Support Without Just Hiring More People

A Lean approach for startups growing faster than their support team can handle KEY TAKEAWAYS On-time resolution jumped from 40% to 68% by switching from push-based assignment to a pull system where technicians take tickets when they have capacity Escalation rate dropped from 20% to 11% through quality standards and visual management Client satisfaction improved from 7/10 to 8/10 with no additional headcount 44-ticket backlog cleared by making flow visible and enforcing a 24-hour assignment rule Your inbox is a disaster. Tickets are piling up. Your support team is stressed, working late, and still falling behind. Customers are getting angrier. Response times are slipping. ...